Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo

Project Overview

EDECS is proud to be entrusted with the Ahl Misr Walkway Nile River – Cairo project in Egypt with executing 1200 meters of the walkway, from Imbaba Bridge to Sahel Bridge, entailing marine piling, dredging, deck slab installation, and construction of buildings. The scope also encompassed comprehensive electromechanical works, including installation of water, drainage, firefighting, and irrigation systems and electrical setup comprising transformers, generators, distribution panels, cable networks, and lighting fixtures. Finally, meticulous landscape and hardscape works were undertaken, featuring stone flooring and cladding, steel fences, stainless steel handrails, and colored concrete walkways.

Project Details:

Sector:
Infrastructure
Location:
Cairo ,Egypt
Client:
Ministry of Housing, Utilities & Urban Communities
Consultant:
ACE Moharram-Bakhoum
Project Type:
Buildings Works, Infrastructure & Site landscape

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
9 Months
Start Date:
October 2020
Completion Date:
July 2021
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project:

  • Building sector: Buildings and Site development
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Jeddah South Container Terminal Works - Stage 3B
01 June 2024
Jeddah South Container Terminal Works - Stage 3B
See More
Suez Canal Container Terminal 2 Extension project
01 October 2024
Suez Canal Container Terminal 2 Extension project
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
01 February 2024
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
01 January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
01 February 2024
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
See More