Construction of Control Gates & Barrages of Bahr Al-Baqar Drain

Construction of Control Gates & Barrages of Bahr Al-Baqar Drain

2021

Project Overview

The Construction of Control Gates & Barrages of Bahr Al-Baqar Drain project in Egypt, led by EDECS, entails the construction of 3 wastewater regulating penstock stations designed to manage a flow of 5 million m³/day. These stations, featuring double steel gates and maintenance cranes, are strategically located along the Bahr Al-Baqar Drain. Components include the Cross Regulator Penstock station on the old Drain 7,500 m3 of reinforced concrete for 7 vents, the Intake Regulator Penstock station 3,500 m3 of reinforced concrete for 4 vents, and the Cross Regulator Penstock station with a weir on the New Drain 6,200 m3 of reinforced concrete for 5 vents.

Project Details:

Sector:
Infrastructure
Location:
Suez ,Egypt
Client:
Ministry of Water Resources and Irrigation
Consultant:
ENOIA Utilities Consulting Engineers and ACE Moharram-Bakhoum
Project Type:
Water Irrigation

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
12 Months
Start Date:
January 2020
Completion Date:
January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
June 2023
See More
Jeddah South Container Terminal Works - Stage 3B
Jeddah South Container Terminal Works - Stage 3B
June 2024
See More
Suez Canal Container Terminal 2 Extension project
Suez Canal Container Terminal 2 Extension project
October 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
December 2018
See More
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
February 2024
See More
Al-Fayrouz Fish Farms, East of Port Said
Al-Fayrouz Fish Farms, East of Port Said
March 2021
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
July 2021
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
February 2024
See More