Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)

Project Overview

EDECS embarked on constructing a multi-purpose terminal at Al-Dekheila Seaport, Berth 100. It involves erecting a 1,775-meter diaphragm-type quay wall at a depth of 17 meters. The project encompasses soil improvement utilizing Prefabricated Vertical Drains (PVD), Vibro-compaction (VC), Dynamic compaction (DC), and Rapid Impact Compaction (RIC). Additionally, deep foundation works will be constructed, including diaphragm walls and piles reaching 38 meters. The superstructure will consist of the Back beam, Front beam, and slab. Furthermore, the installation of berth furniture such as Fenders, Bollards, Ladders, Mooring rings, and crane rails spanning a total length of 1200 meters will be completed. EDECS is committed to delivering excellence in every aspect of Al-Dekheila Seaport Berth 100 project, ensuring superior quality and innovation from inception to completion.

Project Details:

Sector:
Marine
Location:
Dekheila ,Egypt
Client:
Alexandria Port Authority-Ministry of Transportation
Consultant:
G.C. Consultants
Project Type:
Quay wall using concrete blocks and dredging
Main sub-consultants:
Modern Engineering Consulting Office “MECO”

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction (Traditional Form)
Contract Duration:
24 Months
Start Date:
June 2022
Completion Date:
June 2024
Project Execution
Major Quantities
  • 1476 bored piles (1.2 m diameter X 38 m depth)
  • 1494 bored piles (1.5 m diameter X 38 m depth)
  • 53,000-ton reinforcement steel
  • 400,000 cubic meters of concrete
  • 97,500 m2 of Interlock paving
Main Equipment
  • Hydrophraise Cutter Machines 
  • Pilling Machines
  • Dredgers 
  • Prefabricated Vertical Drain Machines 
  • Vibro Compaction Machines 
  • Heavy Cranes
Design Methodology
  • Soil improvement using Prefabricated Vertical Drains (PVD), Vibro-compaction (VC), Dynamic compaction (DC) and Rapid Impact Compaction (RIC)
  • Diaphragm walls using drilling rigs and Hydrophraise
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)

Related Projects

Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
01 April 2024
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
See More
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
01 February 2024
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
See More
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
01 December 2016
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
01 December 2023
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
01 September 2021
Construction of Marassi Marina Prefabricated Aluminium Pontoons
See More
Dredging and Widening Works in Basin-3 Al Sokhna Seaport
01 March 2015
Dredging and Widening Works in Basin-3 Al Sokhna Seaport
See More