Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
2016

Project Overview: (Scope of Work)

At EDECS, we take pride in overseeing the project at Ras Al-Khair Seaport, Saudi Arabia, where our expertise is showcased through dredging operations, construction of a substantial gravity-type quay wall, and meticulous attention to detail in every aspect of the endeavor. The project at Ras Al-Khair Seaport involves dredging over 3.5 million cubic meters to level the basin and trenches, with reclamation exceeding 1.5 million cubic meters. Additionally, a 900-meter-long, 18-meter-deep gravity-type quay wall will be constructed using concrete blocks weighing up to 120 tons each. Other tasks include building a jetty for a 500-ton crane, soil improvement, and various installations. Under a Design & Build contract, the project spanned 29 months, starting in July 2014 and completed in December 2016. We remain committed to delivering exceptional results that exceed expectations.

Project Details:

Sector:
Marines
Location:
Ras Al-Khair ,Saudi Arabia
Name Of Client:
SEAPA - Seaports Authority, Kingdom of Saudi Arabia
Consultant Name:
Lievense Arabia
Project Type:
Concrete Blocks Quay Wall and Dredging
Associating companies:
Joint venture with Rawabi
Construction solution:
Batching Plant & Precast Plant
Main sub-consultants:
Geo-Consultants / COWI

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
29 Months
Start Date:
July 2014
Completion Date:
December 2016
Project Execution
Major Quantities
  • 900 meters of gravity quay wall with 200,000 m3 of concrete for the quay-wall Concrete blocks
  • 3,500,000 m3 Dredging and reclamation using Cutter suction dredger.
  • 4,000 tons Epoxy coated steel reinforcement
  • 350,000 m3  Graded rocks.
Main Equipment
  • Cutter Suction Dredger
  • Vibro Compaction Machines 
  • Floating Crane 250 ton 
  • Setting Barges 
  • Material Barges 3000 Tons 
  • Tug Boat 
  • Diving Station 
  • Crane 500 Tons
  • Cranes” Variant Capacity”
Design Methodology
  • Dredging using cutter suction dredgers
  • Installation of concrete blocks using Cranes and split barge
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)

Related Projects

Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
01 April 2024
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
See More
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
01 February 2024
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
See More
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
01 June 2024
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
See More
Construction of Eastern Quay Wall in East Port Said
01 February 2020
Construction of Eastern Quay Wall in East Port Said
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
01 December 2023
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
01 September 2021
Construction of Marassi Marina Prefabricated Aluminium Pontoons
See More