Dredging and Widening Works in Basin-3 Al Sokhna Seaport

Dredging and Widening Works in Basin-3 Al Sokhna Seaport

2015

Project Overview

EDECS took the lead in the Dredging and Widening Works in Basin-3 Al Sokhna Seaport project in Egypt, a multifaceted project consisting of two integral stages. Initially, in collaboration with esteemed partners, EDECS dredged 330,000 cubic meters of material from Basin-3, depositing it at a designated off-shore dumping area to fulfill the requirements of Dubai Ports World. Subsequently, leveraging the capabilities of the Backhoe Red October, EDECS deepened the basin and widened its northern side, dredging an additional 400,000 cubic meters of material. Simultaneously, essential tasks such as removing existing shore protection, precisely cutting and trimming new slopes, and installing geotextile filters were meticulously executed. These collective endeavors resulted in the establishment of robust protections for the newly formed slopes, significantly enhancing the operational capacity and navigational accessibility of Basin-3 at Al Sokhna Seaport.

Project Details:

Sector:
Marine
Location:
Al Sokhna Port ,Egypt
Client:
Sokhna Port Development Company & Dubai Port World
Project Type:
Dredging Works

Contract Details:

Role in Contract:
Main Contractor
Contract Duration:
60 months
Start Date:
March 2011
Completion Date:
March 2015
Dredging and Widening Works in Basin-3 Al Sokhna Seaport
Dredging and Widening Works in Basin-3 Al Sokhna Seaport
Dredging and Widening Works in Basin-3 Al Sokhna Seaport

Related Projects

Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
April 2024
See More
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
February 2024
See More
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
June 2024
See More
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
December 2016
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
December 2018
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
December 2023
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
February 2024
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
Construction of Marassi Marina Prefabricated Aluminium Pontoons
September 2021
See More