Project Overview
As the main contractor, EDECS led the infrastructure construction of the El Badrasheen Bridge project in Egypt, spanning a 100-m-long, 60-m-wide bridge with 6 lanes. This project involved constructing a 43-m-wide bridge 4 km across the top of the ring road. The initiative was integrated into the broader national road project, particularly the middle ring spanning 147 km, aimed at redistributing traffic loads from Greater Cairo and enhancing connectivity between key road networks.
Project Details:
Client:
Egyptian Government
Consultant:
International Consultant Engineers
Project Type:
Infrastructure Works (Bridges)
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
4 Months
Completion Date:
September 2020