Project Overview
EDECS undertook extensive infrastructure work on a total area of 83,120 m2 for the Jeddah South Container Terminal in KSA. The project included comprehensive earthwork, the construction of paving layers, precise road marking, and the installation of electrical, sewage, and slot drain networks. Additionally, firefighting networks and reefer gantries were incorporated into the design. This project is set to significantly enhance the terminal's operational capacity, boosting the port’s container handling from 2.4 million to a minimum of 4 million TEUs annually upon completion. Key components of the scope involved the supply and installation of pipes, manholes, valves, cables, and high masts, ensuring the terminal's infrastructure meets the highest standards of efficiency and safety.
Project Details:
Location:
Jeddah ,Saudi Arabia
Project Type:
Infrastructure Works
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
6 Months