EDECS undertook extensive infrastructure work on a total area of 83,120 m2 for the Jeddah South Container Terminal in KSA. The project included comprehensive earthwork, the construction of paving layers, precise road marking, and the installation of electrical, sewage, and slot drain networks. Additionally, firefighting networks and reefer gantries were incorporated into the design. This project is set to significantly enhance the terminal's operational capacity, boosting the port’s container handling from 2.4 million to a minimum of 4 million TEUs annually upon completion. Key components of the scope involved the supply and installation of pipes, manholes, valves, cables, and high masts, ensuring the terminal's infrastructure meets the highest standards of efficiency and safety.

Project Details:

Sector:
Infrastructure
Location:
Jeddah ,Saudi Arabia
Client:
DP World
Consultant:
AECOM
Project Type:
Infrastructure Works

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
6 Months
Start Date:
May 2024
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
June 2023
See More
Jeddah South Container Terminal Works - Stage 3B
Jeddah South Container Terminal Works - Stage 3B
June 2024
See More
Suez Canal Container Terminal 2 Extension project
Suez Canal Container Terminal 2 Extension project
October 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
December 2018
See More
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
February 2024
See More
Al-Fayrouz Fish Farms, East of Port Said
Al-Fayrouz Fish Farms, East of Port Said
March 2021
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
January 2021
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
July 2021
See More