Light Rail Train Station New Administrative Capital – Cairo
Light Rail Train Station New Administrative Capital – Cairo
Ongoing

Project Overview

EDECS leads the construction of Light Rail Train Station No 4 at stage 3 Kayan station in the New Administrative Capital, Cairo, project in Egypt. with excavating and erecting 45,000 cubic meters of concrete structures, installing precast reinforced concrete fences, conducting masonry and insulation work, and fitting doors/windows for Light Rail Train Station No 4 at stage 3 Kayan station in the New Administrative Capital, Cairo, Egypt, Additionally, the implementation of firefighting/plumbing systems, power/lighting installations, and the creation of a 40,000 square meter parking area.

Project Details:

Sector:
Buildings
Location:
Cairo ,Egypt
Client:
Ministry of Transportation & The National Authority of Tunnels
Consultant:
Khatib & Alami
Project Type:
Buildings Works (Station)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
30 Months
Start Date:
July 2021
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project:

  • Infrastructure sector: Infrastructure Works (Bridge concrete structures & columns & retaining walls precast beams and steel structure bays)
Light Rail Train Station New Administrative Capital – Cairo
Light Rail Train Station New Administrative Capital – Cairo
Light Rail Train Station New Administrative Capital – Cairo
Light Rail Train Station New Administrative Capital – Cairo
Light Rail Train Station New Administrative Capital – Cairo
Light Rail Train Station New Administrative Capital – Cairo

Related Projects

Terminal Buildings: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Terminal Buildings: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
High-Speed Rail Station Hadayek October – Giza
01 February 2024
High-Speed Rail Station Hadayek October – Giza
See More
Construction of Administrative and Auxiliary Buildings of Sokhna Port
01 November 2024
Construction of Administrative and Auxiliary Buildings of Sokhna Port
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More