Tahya Masr multi-purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr multi-purpose Terminal Alexandria Seaport Berths 55/62
2024

Project Overview: (Scope of Work)

The Tahya Masr multi-purpose Terminal project at Alexandria Seaport, led by EDECS, entails the construction of container berths spanning 1,250 meters in length and 17.5 meters in depth, capable of accommodating 41,000 TEUs. Supporting infrastructure includes storage terminal yards covering 550,000 square meters, environmental barriers stretching 1,800 meters, and extensive soil improvement measures utilizing advanced techniques. Deep foundation works, superstructure construction, and installation of berth furniture and crane rails are integral components of the project. MEP works, utility infrastructure, and essential utility buildings will ensure the terminal's operational efficiency and longevity.

Project Details:

Sector:
Marines
Location:
Alexandria ,Egypt
Name Of Client:
Egyptian Group for multi-purpose Terminal (EGMPT)
Consultant Name:
Dar Al-Handasah Shair and Partners and ECG
Project Type:
Diaphragm wall quay wall & Dredging & Soil improvement & Infrastructure works.
Associating companies:
National Marine Dredging Company (NMDC) and Bauer
Construction solution:
Batching Plant

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction (Traditional Form)
Contract Duration:
49 Months
Start Date:
March 2020
Completion Date:
April 2024
Project Execution
Major Quantities
  • Quay wall Type: Diaphragm wall
  • 1,250 meters of quay wall with 17.5 m depth
  • 12,000,000 m3 reclamation using hopper dredgers
  • 550,000 m2 Soil improvement using Prefabricated Vertical Drains (PVD), Vibro-compaction (VC), and Rapid Impact Compaction (RIC) 
  • 1,250 diaphragm wall panels (1.2 m width X 40 m depth)
  • 645 bored piles (1.2 m diameter X 40 m depth)
  • 330 barrettes (0.8 m width X 40 m depth)
  • Barrettes, with a total length of 42,028 m and concrete quantities of 54,235 m3
  • 170,000 m3 Concrete
  • 42,000 tons Steel
  • Environmental barrier of 1,800 m in length
Main Equipment
  • Hydrophraise Cutter Machines 
  • Pilling Machines 
  • Hopper Dredgers 
  • Prefabricated Vertical Drain Machines 
  • Vibro Compaction Machines 
  • Rapid Compaction Machines 
  • Heavy Cranes
     
Design Methodology
  • Soil improvement using Prefabricated Vertical Drains (PVD), Vibro-compaction (VC), and Rapid Impact Compaction (RIC)
  • Dredging using cutter hopper dredgers
  • Diaphragm walls using drilling rigs and Hydrophraise
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project:-

  • Building sector:  Port Buildings
  • Infrastructure sector: Construction of infrastructure networks (Electromechanics) 
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62

Related Projects

Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
01 February 2024
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
See More
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
01 June 2024
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
See More
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
01 December 2016
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
See More
Construction of Eastern Quay Wall in East Port Said
01 February 2020
Construction of Eastern Quay Wall in East Port Said
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
01 December 2023
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
01 September 2021
Construction of Marassi Marina Prefabricated Aluminium Pontoons
See More