Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport

Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport

2024

Project Overview

EDECS is constructing the Western Edge Retaining Wall for the Basin II, Port of Sokhna project in Egypt. This entails erecting a 480-meter-long quay wall mounting with an anchoring system and barrette wall system.

Project Details:

Sector:
Infrastructure Development
Location:
Ain Al Sokhna, Egypt
Client:
DP World Sokhna
Consultant:
Pacer Consultants
Project Type:
Infrastructure Works

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
13 Months
Start Date:
January 2023
Completion Date:
February 2024
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project: 

  • Marine sector: Diaphragm Wall Quay Wall
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
June 2023
See More
Jeddah South Container Terminal Works - Stage 3B
Jeddah South Container Terminal Works - Stage 3B
June 2024
See More
Suez Canal Container Terminal 2 Extension project
Suez Canal Container Terminal 2 Extension project
October 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
December 2018
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
July 2021
See More
Arterial Road at East Port Said Seaport
Arterial Road at East Port Said Seaport
January 2010
See More
Sokhna Container Terminal Civil Works Phase 1A
Sokhna Container Terminal Civil Works Phase 1A
December 2025
See More
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
November 2024
See More