Project Overview: (Scope of Work)

EDECS led the infrastructure construction of the Abou El Nomros Bridge Intercity Cairo & Aswan project in Egypt, which is at the top of the Abu El Nomros crossing and divided into dual segments. The initial segment, situated east of the railway, comprises two exits, one connecting to the Cairo-Aswan Road. The subsequent segment lies to the west of the railway. Spanning 1530-meter-long, 90-meter-wide bridge and features 4 lanes.

Project Details:

Sector:
Infrastructure
Location:
Cairo ,Egypt
Name Of Client:
Ministry of Transport (Roads & Bridges Authority)
Consultant Name:
International Consultant Engineers
Project Type:
Infrastructure Works (Bridges)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
20 Months
Start Date:
July 2022
Completion Date:
March 2024
Project Execution
Major Quantities
  • 100 Bored Piles (1.0 m Diameter & 3,000 m Length)
  • 12 Bored Piles (1.2 m Diameter & 380 m Length)
  • 30 CFA piles (600 mm Diameter & 550 m Length)
  • 25,000 m3 Concrete
  • 5,800 Tons Steel
Design Methodology
  • Slab on Pile
  • Precast Beams
Abou El Nomros Bridge Intercity Cairo & Aswan – Egypt
Abou El Nomros Bridge Intercity Cairo & Aswan – Egypt
Abou El Nomros Bridge Intercity Cairo & Aswan – Egypt
Abou El Nomros Bridge Intercity Cairo & Aswan – Egypt

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Jeddah South Container Terminal Works - Stage 3B
01 June 2024
Jeddah South Container Terminal Works - Stage 3B
See More
Suez Canal Container Terminal
01 October 2024
Suez Canal Container Terminal
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
01 January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo