Cairo – Al Fayoum HSR Bridge Intercity Cairo & Fayoum –Egypt

Cairo – Al Fayoum HSR Bridge Intercity Cairo & Fayoum –Egypt

2024

Project Overview

As the main contractor of the Al Fayoum HSR Bridge Intercity Cairo & Fayoum project in Egypt, EDECS is responsible for the infrastructure construction of 14,000 m of deep foundation piles and an 80,000 m3 box girder concrete deck slab reinforced with high-strength prestressing wires. Additionally, we're responsible for road and earthworks, including excavation, retaining walls, road base, asphalt layers, traffic sign systems, and lighting installations. This Bridge is a link between Cairo and Fayoum, Egypt, with a 1,600-m-long, 76-m-wide bridge that includes a main bridge in both directions, two wide service bridges, and a wide long ramp.

Project Details:

Sector:
Infrastructure
Location:
Cairo ,Egypt
Client:
Ministry of Transportation & Public Authority for Roads and Bridges
Consultant:
ACE Moharram Bakhoum
Project Type:
Infrastructure Works (Bridges)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
24 Months
Start Date:
February 2022
Completion Date:
February 2024
Cairo – Al Fayoum HSR Bridge Intercity Cairo & Fayoum –Egypt
Cairo – Al Fayoum HSR Bridge Intercity Cairo & Fayoum –Egypt
Cairo – Al Fayoum HSR Bridge Intercity Cairo & Fayoum –Egypt
Cairo – Al Fayoum HSR Bridge Intercity Cairo & Fayoum –Egypt
Cairo – Al Fayoum HSR Bridge Intercity Cairo & Fayoum –Egypt

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
June 2023
See More
Jeddah South Container Terminal Works - Stage 3B
Jeddah South Container Terminal Works - Stage 3B
June 2024
See More
Suez Canal Container Terminal 2 Extension project
Suez Canal Container Terminal 2 Extension project
October 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
December 2018
See More
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
February 2024
See More
Al-Fayrouz Fish Farms, East of Port Said
Al-Fayrouz Fish Farms, East of Port Said
March 2021
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
January 2021
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
July 2021
See More