Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
2024

Project Overview: (Scope of Work)

EDECS is accountable for the construction of Ain Al Sokhna Seaport Berths 2, 4, and 6 in Egypt, focusing on essential elements such as Quay walls spanning 2560 meters in length with an 18-meter depth, utilizing a diaphragm wall system. Deep foundation works involve diaphragm walls, piles, and Barrettes that extend to 39 meters in depth. Superstructure works include Transverse girder, Back beam, Front beam, and top slab construction. Berth furniture installation encompasses fenders, bolts, ladders, and mooring rings, while 1400 meters of crane rails (A150) are also installed. With meticulous attention to detail and a commitment to excellence, EDECS ensures the seamless completion of the Ain Al Sokhna Seaport Berths 2, 4, and 6, setting new standards of quality and efficiency in port construction.

Project Details:

Sector:
Marines
Location:
Ain Al Sokhna ,Egypt
Name Of Client:
General Authority For Roads And Buildings (GARB)-Ministry Of Transportation
Consultant Name:
Dar Al-Handasah Shair and Partners
Project Type:
Diaphragm Wall Quay Wall
Construction solution:
Batching Plant
Main sub-consultants:
GC Consultants

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction (Traditional Form)
Contract Duration:
26 Months
Start Date:
December 2021
Completion Date:
February 2024
Project Execution
Major Quantities
  • 2560 meters of Quay wall with 18 m depth
  • 2,560 diaphragm wall panels (1.2 m width X 34 m depth)
  • 1457 bored piles (1.2 m diameter X 39 m depth)
  • 682 barrettes (0.8 m width X 36 m depth)
  • 70,000 Ton steel reinforcement installation 
  • 353,000 cubic meters of concrete
  • Supply and install 700 panzer belts
  • Install 1400m crane rails
Main Equipment
  • Hydrophraise Cutter Machines 
  • Pilling Machines 
  • Mechanical Grabs
Design Methodology

Diaphragm walls using drilling rigs and Hydrophraise

Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6

Related Projects

Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
01 April 2024
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
See More
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
01 June 2024
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
See More
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
01 December 2016
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
See More
Construction of Eastern Quay Wall in East Port Said
01 February 2020
Construction of Eastern Quay Wall in East Port Said
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
01 December 2023
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
01 September 2021
Construction of Marassi Marina Prefabricated Aluminium Pontoons
See More