High-Speed Rail Viaduct Hadayek October – Giza
High-Speed Rail Viaduct Hadayek October – Giza
Ongoing

Project Overview

EDECS leads the High-Speed Rail Viaduct in Hadayek October – Giza, erecting a state-of-the-art railway spanning 1750 km, capable of reaching speeds up to 250 km/hr. The project encompasses Bridgeworks, which entail 16,000 m of piling, extended wires for retaining wall backs, and a primary bridge structure constructed with 40,000 m3 of precast prestressed concrete girders and deck slab. Moreover, Track embankment works involve excavation, backfilling, laying base layers, and installing 30,000 m2 of concrete slab. Access road development includes establishing base and asphalt layers, while road and earthworks consist of excavation, reinforced panels, retaining walls, road base, and two layers of asphalt, as well as the installation of traffic signs, curbs, and barriers.

Project Details:

Sector:
Infrastructure
Location:
Giza ,Egypt
Client:
Ministry of Transportation & Public Authority for Roads and Bridges
Consultant:
SYSTRA & SIMENS
Project Type:
Infrastructure Works (Bridges-Railway)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
31 Months
Start Date:
October 2021
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project:-

  • Building sector: Buildings Works (Station)
High-Speed Rail Viaduct Hadayek October – Giza
High-Speed Rail Viaduct Hadayek October – Giza
High-Speed Rail Viaduct Hadayek October – Giza
High-Speed Rail Viaduct Hadayek October – Giza

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Jeddah South Container Terminal Works - Stage 3B
01 June 2024
Jeddah South Container Terminal Works - Stage 3B
See More
Suez Canal Container Terminal 2 Extension project
01 October 2024
Suez Canal Container Terminal 2 Extension project
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
01 February 2024
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
01 January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo
See More