Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria

Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria

2023

Project Overview

The project Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria in Egypt, led by EDECS, entails the construction of the infrastructure for marine terminals covering a vast stacking yard of 550,000m2, includes the installation of critical utility networks such as storm, Potable water, Sewer, and Firefighting. This involves a robust MV power network spanning 120Km of cables, 3 switchgear, and 16 substations, along with LV power network covering 200Km and a SCADA system with over 9,000 points with 80 Km of Fiber-optics cables, a fire pump station, oil separators, a lifting station, and a water treatment plant. The new container terminal foresees to handle 41,000 TEUs annually and is equipped to utilize Quay Cranes (QCs), electrical Rubber Tyred Gantry Cranes (eRTGCs), reefer gantry and120 plugs all designed to enhance operational efficiency and ensure the terminal's longevity.

Project Details:

Sector:
Infrastructure Development
Location:
Alexandria, Egypt
Client:
Egyptian Group for Multi-Purpose Terminal (EGMPT)
Consultant:
Dar Al-Handasah Shair and Partners
Project Type:
Infrastructure Works (Electromechanics)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
15 Months
Start Date:
March 2022
Completion Date:
June 2023
Integrated Services

Our comprehensive services significantly contributed to the success of this project:-

  • Marine Sector: Quay wall using diaphragm wall type, Reclamation with dredging material & Soil improvement
  • Building Sector:  Port operational facilities
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria

Related Projects

Jeddah South Container Terminal Works - Stage 3B
Jeddah South Container Terminal Works - Stage 3B
June 2024
See More
Suez Canal Container Terminal 2 Extension project
Suez Canal Container Terminal 2 Extension project
October 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
December 2018
See More
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
February 2024
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
July 2021
See More
Arterial Road at East Port Said Seaport
Arterial Road at East Port Said Seaport
January 2010
See More
Sokhna Container Terminal Civil Works Phase 1A
Sokhna Container Terminal Civil Works Phase 1A
December 2025
See More
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
November 2024
See More