Project Overview: (Scope of Work)

EDECS undertook extensive infrastructure work on a total area of 83,120 square meters for the Jeddah South Container Terminal in KSA. The project included comprehensive earthwork, the construction of paving layers, precise road marking, and the installation of electrical, sewage, and slot drain networks. Additionally, firefighting networks and reefer gantries were incorporated into the design.This project is set to significantly enhance the terminal's operational capacity, boosting the port’s container handling from 2.4 million to a minimum of 3.8 million TEUs by 2024. Key components of the scope involved the supply and installation of pipes, manholes, valves, cables, and high masts, ensuring the terminal's infrastructure meets the highest standards of efficiency and safety.

Project Details:

Sector:
Infrastructure
Location:
Jeddah ,Saudi Arabia
Name Of Client:
DP World
Consultant Name:
AECOM
Project Type:
Infrastructure Works

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
6 Months
Start Date:
May 2024
Completion Date:
November 2024
Project Execution
Major Quantities
  • 75,440 square meters of yard heavy duty paving
  • 40,000 cubic meters of concrete
  • 21,256 m Copper cables.
  • 1310 m HDPE pipes
  • 8 Mono-piles
  • 8 High masts Infrastructure Works
  • 18 Lighting poles
Main Equipment
  • Pilling machine 
  • Excavators 
  • Loaders 
  • Cranes 
  • Telescopic forklift 
  • Generators 
  • Graders 
  • Welding Machine 
  • Bobcat 
  • Water truck 
  • Batch plants
Design Methodology
  • Excavate Ducts and manholes
  • Installation of Electro-Mechanic Underground works (Manholes - Duct Banks – Piping-Storm Water Channel - Valves)
  • Supply and installation of pipes then pulling of cables
  • Completing the piles working using piling rigs & Install High Masts and lighting poles
  • Installation for pavement works (CBGM-Bedding Layer-Sub Base-Interlock)
  • Supply & Install Road Markings & Signs
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B
Jeddah South Container Terminal Stage 4B

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Jeddah South Container Terminal Works - Stage 3B
01 June 2024
Jeddah South Container Terminal Works - Stage 3B
See More
Suez Canal Container Terminal
01 October 2024
Suez Canal Container Terminal
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
01 January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo
See More