Project Overview: (Scope of Work)

EDECS is proud to contribute to the Jeddah South Container Terminal Works - Stage 3B in saudi arabia, a pivotal infrastructure project aimed at enhancing port capacity and operational efficiency. This comprehensive project spans 150,000 square meters and involves intricate earthwork, paving layers, road marking, and the development of extensive electrical, sewage, slot drain, and firefighting networks. Additionally, reefer gantries have been integrated to accommodate temperature-sensitive cargo.The project’s completion will significantly bolster the port’s container handling capacity, elevating it from 2.4 million TEUs to a minimum of 3.8 million TEUs. Our scope of work includes the meticulous supply and installation of essential components such as pipes, manholes, valves, cables, and high masts, ensuring the infrastructure's durability and efficiency.

Project Details:

Sector:
Infrastructure
Location:
Jeddah ,Saudi Arabia
Name Of Client:
DP World
Consultant Name:
AECOM
Project Type:
Infrastructure Works

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
9 Months
Start Date:
September 2023
Completion Date:
June 2024
Project Execution
Major Quantities
  • 157,055 square meters of yard heavy duty paving
  • 93,000 cubic meters of concrete
  • 36,000 m Copper cables.
  • 13,500 m HDPE pipes
  • 4 Mono-piles
  • 4 High masts
  • 16 Lighting pole
Main Equipment
  • Pilling machine 
  • Excavators 
  • Loaders 
  • Cranes 
  • Telescopic forklift 
  • Generators 
  • Graders 
  • Welding Machine 
  • Bobcat 
  • Water truck 
  • Batch plants
Design Methodology
  • Excavate Ducts and manholes
  • Installation of Electro-Mechanic Underground works (Manholes - Duct Banks – Piping-Storm Water Channel - Valves)
  • Supply and installation of pipes then pulling of cables
  • Completing the piles working using piling rigs & Install High Masts and lighting poles
  • Installation for pavement works (CBGM-Bedding Layer-Sub Base-Interlock)
  • Supply & Install Road Markings & Signs
Jeddah South Container Terminal Works - Stage 3B
Jeddah South Container Terminal Works - Stage 3B
Jeddah South Container Terminal Works - Stage 3B

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Suez Canal Container Terminal
01 October 2024
Suez Canal Container Terminal
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
01 January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
01 February 2024
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
See More