LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
Ongoing

Project Overview

Explore the latest collaborative project by EDECS The LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo project in Egypt, a collaborative effort between the Ministry of Transport, the National Authority for Tunnels, EDECS, and Chinese CREC-AVIC companies, that entailed constructing a 2,800-meter Light Speed Rail viaduct and installing 21,150 m of deep foundation piles. Additionally, our responsibilities include erecting the concrete structures for the main bridge, such as foundations, columns, and retaining walls, and producing 80,000 m3 of precast prestressed concrete with bearing and expansion joints.

Project Details:

Sector:
Infrastructure
Location:
Cairo ,Egypt
Client:
Ministry of Transportation & The National Authority of Tunnels
Consultant:
Khatib & Alami
Project Type:
Infrastructure Works (Bridges-Railway)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
31 Months
Start Date:
July 2021
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project: -

  • Building sector: Buildings Works (Station)
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Jeddah South Container Terminal Works - Stage 3B
01 June 2024
Jeddah South Container Terminal Works - Stage 3B
See More
Suez Canal Container Terminal 2 Extension project
01 October 2024
Suez Canal Container Terminal 2 Extension project
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
01 February 2024
Western Edge Retaining Wall 480m for Basin II, Port of Sokhna
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
01 January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo
See More