Project Overview: (Scope of Work)

EDECS proudly undertakes the construction of Phase 1A of the Sokhna Container Terminal in Egypt, a pivotal project aimed at enhancing the maritime infrastructure in the region.Spanning approximately 65 hectares, this project includes the development of a state-of-the-art container yard featuring heavy-duty pavements and a 1200-meter-long quay with an 18-meter depth. Once operational, the terminal is expected to handle 1,610,000 TEUs annually, equipped with advanced Quay Cranes (QCs)/(STS), electrical Rubber Tyred Gantry Cranes (eRTGs), and Autonomous Trucks (ATTs). Also, EDECS scope involves the construction of various buildings totaling a built-up area of 27,000 square meters. These include electrical stations, a gate complex, an administration and security building, a customs and cashier building, a stevedore and mass building, and a workshop. This endeavor reflects EDECS's commitment to delivering high-quality, large-scale infrastructure projects, contributing significantly to the region's economic growth.

Project Details:

Sector:
Infrastructure
Location:
Ain Al Sokhna ,Egypt
Name Of Client:
Red Sea Containers Terminals S.A.E
Consultant Name:
S.J.S
Project Type:
Infrastructure & Buildings
Main sub-consultants:
INFRA, FUGRO, Dr. Ahmed Hosny

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
EPC
Contract Duration:
18 Months
Start Date:
June 2024
Completion Date:
December 2025
Project Execution
Major Quantities
  • Concrete quantities with different grades at buildings and yard area are 207,000 m3
  • Concrete pavement with 2 types is approximately 213,000 m2
  • Asphalt pavement with 2 types is approximately 73,000 m2
  • 68 Reefer Gantries
  • Steel structure with approximate quantities 2500 ton
  • Runway beams under ERTG Cranes are 10,500 m.l
  • Plinth beams under containers are 459 pcs
  • Railway Depot with 1600 m.l 
  • Fences with approximate quantities 11,000 m.l with 5 types
  • Storm, Sewage, Fire, and water networks with approximate quantities 37,000 m.l.
  • Electrical Networks MV and LV cables with approximate quantities 148,500 m.l 
  • Electrical Duct bank (HV+LV, LV+ELV) are approximately 21900
Main Equipment
  • 8 Switch Gears
  • 10 Dry and oil transformers
  • 3 Generators
  • 2 Fire and water pumps
  • 5 Storm and sewage lift station pumps
  • 31 Lighting Towers 35 m
  • 12 Lighting Towers 20 m
  • Data Center
  • Scada control System
  • Overhead cranes
  • Electrical conductor
Sokhna Container Terminal Civil Works Phase 1A
Sokhna Container Terminal Civil Works Phase 1A
Sokhna Container Terminal Civil Works Phase 1A
Sokhna Container Terminal Civil Works Phase 1A
Sokhna Container Terminal Civil Works Phase 1A
Sokhna Container Terminal Civil Works Phase 1A
Sokhna Container Terminal Civil Works Phase 1A

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Jeddah South Container Terminal Works - Stage 3B
01 June 2024
Jeddah South Container Terminal Works - Stage 3B
See More
Suez Canal Container Terminal
01 October 2024
Suez Canal Container Terminal
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
01 February 2024
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
01 January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo
See More