Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
2024

Project Overview: (Scope of Work)

EDECS, as the main contractor, is responsible for constructing a 480-meter quay wall of diaphragm type with a tie rod system for Basin 2 at Al Sokhna Seaport, Egypt. This includes essential furnishings such as fenders, bollards, ladders, and an anchoring system. A barrette wall will also be constructed to secure the tie rod system. MEP works and road construction for the area behind the quay wall are also part of the scope. The project involves significant quantities, including 480 front and back diaphragm wall panels, 22 bored piles, 160 tie rods, and extensive concrete and pavement installations.

Project Details:

Sector:
Marines
Location:
Ain Al Sokhna ,Egypt
Name Of Client:
DP world Sokhna
Consultant Name:
Pacer Consultants
Project Type:
Diaphragm Wall Quay Wall
Associating companies:
Bauer
Construction solution:
Batching Plant
Main sub-consultants:
Nile Engineering Consulting Bureau NECB

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction (Traditional Form)
Contract Duration:
13 Months
Start Date:
January 2023
Completion Date:
February 2024
Project Execution
Major Quantities
  • 480 meters of Quay wall with 18 m depth
  • 480 front diaphragm wall panels (1.2 m width X 30 m depth)
  • 480 back diaphragm wall panels (0.8 m width X 15 m depth)
  • 22 bored piles (1.2 m diameter X 30 m depth)
  • 160 tie rods 
  • 7,000 ton steel reinforcement installation 
  • 27,000 cubic meters of concrete
  • 16600 m2 of concrete block pavement
  • Install 1600 m2 keystone
  • Install 4 high mast 
Main Equipment
  • Hydrophraise Cutter Machines
  • Heavy Cranes 
Design Methodology
  • Diaphragm walls using drilling rigs and Hydrophraise
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project:-

  • Infrastructure sector: Earthwork and Infrastructure Works
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport

Related Projects

Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
01 April 2024
Tahya Masr Multi-Purpose Terminal Alexandria Seaport Berths 55/62
See More
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
01 February 2024
Construction of Ain Al Sokhna Seaport Berth /Basin 2,4 and 6
See More
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
01 June 2024
Construction of multi-purpose Terminal at Al-Dekheila Seaport, Berth 100 (Quay Wall)
See More
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
01 December 2016
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
See More
Construction of Eastern Quay Wall in East Port Said
01 February 2020
Construction of Eastern Quay Wall in East Port Said
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
01 December 2023
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
01 September 2021
Construction of Marassi Marina Prefabricated Aluminium Pontoons
See More