Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
2024

Project Overview: (Scope of Work)

EDECS is constructing the Western Edge Retaining Wall for the Basin 2, Al Sokhna Seaport project in Egypt. This entails erecting a 480-meter-long quay wall equipped with furnishings such as fenders, bollards, ladders, and an anchoring system. We also construct a barrette wall to secure the tie rod system.

Project Details:

Sector:
Infrastructure
Location:
Ain Al Sokhna ,Egypt
Name Of Client:
DP World Sokhna
Consultant Name:
Pacer Consultants
Project Type:
Infrastructure Works

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
13 Months
Start Date:
January 2023
Completion Date:
February 2024
Project Execution
Major Quantities
  • Install Drainage, Electric, and Firefighting Network
  • Install 4 High Mast
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project: 

  • Marine sector: Diaphragm Wall Quay Wall
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
01 June 2023
Infrastructure Works: Berths 55/62 Tahya Masr Multi-Purpose Terminal Alexandria
See More
Jeddah South Container Terminal Works - Stage 3B
01 June 2024
Jeddah South Container Terminal Works - Stage 3B
See More
Suez Canal Container Terminal
01 October 2024
Suez Canal Container Terminal
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
01 December 2018
Construction of 680 m multi-purpose Terminal at Damietta Seaport
See More
Al-Fayrouz Fish Farms, East of Port Said
01 March 2021
Al-Fayrouz Fish Farms, East of Port Said
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
01 January 2021
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
See More
Ahl Misr Walkway Nile River – Cairo
01 July 2021
Ahl Misr Walkway Nile River – Cairo
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
01 February 2024
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
See More